期刊论文详细信息
Water
Reservoir Operation Rules for Controlling Algal Blooms in a Tributary to the Impoundment of Three Gorges Dam
Jijian Lian2  Ye Yao2  Chao Ma2  Qizhong Guo1 
[1] Department of Civil and Environmental Engineering, Rutgers, The State University of New Jersey, Piscataway, NJ 08854, USA; E-Mail:;State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin 300072, China; E-Mails:
关键词: Three Gorges Reservoir;    Xiangxi River;    reservoir operation rules;    algal bloom;    density current;   
DOI  :  10.3390/w6103200
来源: mdpi
PDF
【 摘 要 】

Since the first impoundment of Three Gorges Dam in 2003, algal blooms occur frequently in the near-dam tributaries. It is widely recognized that the impoundment-induced change in hydrodynamic condition with the lower current velocity will make the eutrophication problem even more severe when an excessive amount of nutrients is already loaded into a reservoir and/or its tributaries. Operation tests carried out by Three Gorges Corporation in 2010 point to some feasible reservoir operation schemes that may have positive impacts on reducing the algal bloom level. In our study, an attempt is made to obtain, through a numerical hydrodynamic and water quality modeling and analysis, the reservoir operation rules that would reduce the level of algal blooms in the Xiangxi River (XXR), a near-dam tributary. Water movements and algal blooms in XXR are simulated and analyzed under different scenarios of one-day water discharge fluctuation or two-week water level variation. The model results demonstrate that the reservoir operations can further increase the water exchange between the mainstream of the Three Gorges Reservoir (TGR) and the XXR tributary and thus move a larger amount of algae into the deep water where it will die. Analysis of the model results indicate that the water discharge fluctuation constituted of a lower valley-load flow and a larger flow difference for the short-term operation (within a day), the rise in water level for the medium-term operation (e.g., over weeks), and the combination of the above two for the long-term operation (e.g., over months) can be the feasible reservoir operation rules in the non-flood season for TGR.

【 授权许可】

CC BY   
© 2014 by the authors; licensee MDPI, Basel, Switzerland.

【 预 览 】
附件列表
Files Size Format View
RO202003190020502ZK.pdf 3019KB PDF download
  文献评价指标  
  下载次数:6次 浏览次数:11次