期刊论文详细信息
Proceedings of the International Conference on Coastal Engineering
CONSTRUCTION OF TWO NEW BREAKWATERS AT OSTEND LEADING TO AN IMPROVED HARBOUR ACCESS
Hadewych Verhaeghe3  Jan Goemaere3  Julien De Rouck1  Luc Van Damme3  Wim Van Alboom2 
[1] Ghent University;SECO;Department Mobility and Public Works, Vrijhavenstraat
关键词: rubble-mound breakwater;    harbour access;    breakwater design;   
DOI  :  10.9753/icce.v32.structures.53
学科分类:建筑学
来源: Coastal Engineering Research Council
PDF
【 摘 要 】

The need of an improved harbour access resulted into the design of two new breakwaters in Ostend. The construction of the new breakwaters fits within the Integrated Coastal and Maritime Plan for Ostend. This paper describes the history, the extensive studies, the architecture and the construction works of the breakwaters. Finally future developments are considered.

【 授权许可】

Unknown   

【 预 览 】
附件列表
Files Size Format View
RO201912020441935ZK.pdf 6880KB PDF download
  文献评价指标  
  下载次数:8次 浏览次数:9次