期刊论文详细信息
Proceedings of the International Conference on Coastal Engineering
ADJUSTMENTS TOWARD EQUILIBRIUM OF A LARGE FLOOD-TIDAL DELTA AFTER A MAJOR DREDGING PROGRAM, TAURANGA HARBOUR, NEW ZEALAND
Kerry Black1  Joseph Mathew1  Terry Healy1  Willem de Lange1 
[1] Coastal Marine Group, Department of Earth Sciences, University of Waikato
关键词: harbor;    Tauranga Harbor;    New Zealand;    tidal delta;    flood tide;    dredging;    delta equilibrium;   
DOI  :  10.9753/icce.v25.%p
学科分类:建筑学
来源: Coastal Engineering Research Council
PDF
【 摘 要 】

The Port of Tauranga is located within a tidal inlet estuarine lagoon system which has been dredged to improve navigation for shipping since 1968. In 1992 a major dredging program deepened the entrance navigation channel through the ebb-tidal delta from 10 to 14 m, and the inner harbor channels to -13 m. As a condition of the consent to dredge a detailed monitoring program was required which included annual hydrographic surveys over the flood and ebb-tidal delta as well as recording current meter records from morphodynamically sensitive locations to compare with records taken before the dredging. Results of the hydrographic surveys showed significant morphodynamic change of the flood-tidal delta had occurred essentially by the time the 6 month dredging program was completed. Comparison of the S4 current meter recordings showed current changes consistent with expectations of the EIA. Changes on the ebb-tidal delta were not expected but have occurred although not as rapidly, and seem to be ongoing.

【 授权许可】

Unknown   

【 预 览 】
附件列表
Files Size Format View
RO201912020441292ZK.pdf 274KB PDF download
  文献评价指标  
  下载次数:8次 浏览次数:8次