期刊论文详细信息
Proceedings of the International Conference on Coastal Engineering
COST-EFFECTIVENESS OF I) ARMOR BREAKWATER
Josep R. Medina1 
[1] Director of the Lab. of Ports and Coasts, Dep. of Transportation, Univ. Politecnica de Valencia
关键词: cost effectiveness;    armor;    D-armor;    breakwater;   
DOI  :  10.9753/icce.v24.%p
学科分类:建筑学
来源: Coastal Engineering Research Council
PDF
【 摘 要 】

The cost-effectiveness of conventional and D-armor breakwaters are compared. Initial cost and capitalized anticipated damage during the lifetime of the structure are the basic elements to be considered in the economic optimization problem. A four level structural response function and a linear initial construction cost estimation are used to define the economic function. An exponential approximation to the return period of the design wave storm with an uncertainty factor is used to estimate the economic impact of the wave climate uncertainty. Finally, the adaptative design concept is introduced considering the advantages of designing for repairing and monitoring breakwaters after construction.

【 授权许可】

Unknown   

【 预 览 】
附件列表
Files Size Format View
RO201912020440886ZK.pdf 211KB PDF download
  文献评价指标  
  下载次数:1次 浏览次数:1次