期刊论文详细信息
Proceedings of the International Conference on Coastal Engineering
OPTIMIZING DUMPING SITES NEAR DREDGED CHANNELS
Ulrich Kogel1  Friedrich Ohlmeyer2 
[1] Federal Waterways and Shipping Administration / Agency Cuxhaven;Hydraulics Research Station of the Federal Institute of Waterways
关键词: dredged channel;    dumping site;    optimized dumping;   
DOI  :  10.9753/icce.v19.%p
学科分类:建筑学
来源: Coastal Engineering Research Council
PDF
【 摘 要 】

To maintain the depth of the deepwater channel of the Elbe-Waterway extensive dredging has to be done permanently. Dumping should be optimized, choosing sites near the dredging area but with a small risk of recirculation of the dumped material. In order to estimate this risk field measurements with current meters and radioactive tracer tests in field and model were carried out.

【 授权许可】

Unknown   

【 预 览 】
附件列表
Files Size Format View
RO201912020439820ZK.pdf 180KB PDF download
  文献评价指标  
  下载次数:3次 浏览次数:1次