期刊论文详细信息
Proceedings of the International Conference on Coastal Engineering | |
OPTIMIZING DUMPING SITES NEAR DREDGED CHANNELS | |
Ulrich Kogel1  Friedrich Ohlmeyer2  | |
[1] Federal Waterways and Shipping Administration / Agency Cuxhaven;Hydraulics Research Station of the Federal Institute of Waterways | |
关键词: dredged channel; dumping site; optimized dumping; | |
DOI : 10.9753/icce.v19.%p | |
学科分类:建筑学 | |
来源: Coastal Engineering Research Council | |
【 摘 要 】
To maintain the depth of the deepwater channel of the Elbe-Waterway extensive dredging has to be done permanently. Dumping should be optimized, choosing sites near the dredging area but with a small risk of recirculation of the dumped material. In order to estimate this risk field measurements with current meters and radioactive tracer tests in field and model were carried out.
【 授权许可】
Unknown
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
RO201912020439820ZK.pdf | 180KB | download |