期刊论文详细信息
Proceedings of the International Conference on Coastal Engineering
PROCEDURE FOR DETERMINING DREDGING REQUIREMENTS IN COASTAL INLET CHANNELS
Limberios Vallianos1  James W. Forman1 
[1] Coastal Engineering Branch, U.S. Army Corps of Engineers, Wilmington District, Wilmington
关键词: coastal inlet;    inlet channel;    channel;    dredging requirements;   
DOI  :  10.9753/icce.v19.%p
学科分类:建筑学
来源: Coastal Engineering Research Council
PDF
【 摘 要 】

In order to assess the technical feasibility of a long term maintenance dredging plan at Oregon Inlet, a simple procedure was devised to evaluate the capabilities of existing ocean going hopper dredges to maintain an ocean entrance channel in an inlet environment characterized by wave climate and resulting influx of littoral material as severe as any Atlantic coast location. The dredging analysis procedure described in this paper was used to evaluate dredge plant capabilities under the operational constraints imposed by depth limitations resulting from the continuous influx of sediment into the project channel, the wave climate, and dredging production capacity in terms of actual hopper capacity and cycle times for different disposal schemes. The shoaling and dredging simulation procedure is described in terms of its application to the proposed navigation project at Oregon Inlet, NC.

【 授权许可】

Unknown   

【 预 览 】
附件列表
Files Size Format View
RO201912020439722ZK.pdf 240KB PDF download
  文献评价指标  
  下载次数:7次 浏览次数:9次