期刊论文详细信息
Malaysian Journal of Computer Science
Effect of CMMI-Based Software Process Maturity on Software Schedule Estimation
Rodina Ahmad1  Maged A. Alyahya1  Sai Peck Lee1 
关键词: Schedule estimation;    scale factor;    cost driver;    COCOMO;    SW-CMM;    CMMI;   
DOI  :  
学科分类:社会科学、人文和艺术(综合)
来源: University of Malaya * Faculty of Computer Science and Information Technology
PDF
【 摘 要 】

The Software Capability Maturity Model (SW-CMM) has become a popular model for enhancing software development processes with the goal of developing high-quality software within budget and schedule. The software cost estimation model, COnstructive COst MOdel (COCOMO), in its last update (COCOMO II) has a set of seventeen cost drivers and a set of five scale factors. Process Maturity (PMAT) is one of the five scale factors and its ratings are based on SW-CMM. This paper investigates the impact of process maturity on software development Schedule (cycle time) by deriving a new set of COCOMO II’s PMAT rating values based on the most recent version of CMM, i.e. Capability Maturity Model Integration (CMMI). The precise data for the analysis were collected from the record of 40 historical projects which spanned the range of CMMI Levels, from Level 1 (Lower half and Upper half) to Level 4, where eight data points were collected from each level. The Ideal Scale Factor (ISF) method is applied in order to withhold the effect of the COCOMO II’s PMAT scale factor. All prediction accuracies evaluations were measured using PRED (.20). The study shows that the proposed model (with the new PMAT rating values) produced better schedule estimates as compared to the generic COCOMO II model’s schedule estimates.

【 授权许可】

Unknown   

【 预 览 】
附件列表
Files Size Format View
RO201912010262596ZK.pdf 412KB PDF download
  文献评价指标  
  下载次数:63次 浏览次数:60次