期刊论文详细信息
Heron
Geotechnical applications and conditions of the observational method
S. van Baars and J.K. Vrijling1 
[1] Delft University of Technology, Faculty of Civil Engineering and Geosciences, Delft, The Netherlands$$
关键词: Observational method;    geomechanics;    design;    cost and risk analysis;    Bayesian updating;   
DOI  :  
学科分类:建筑学
来源: Technische Universiteit Delft * Faculty of Civil Engineering
PDF
【 摘 要 】

Information observed during construction can be used to optimise the remaining parts of the construction of structure. In this article general conditions are indicated for the implementation of the Observational Method in geotechnical engineering. The most important condition is that the uncertain field condition (the observational data) must be clear to measure. For example in case of a brittle soil behaviour, there is no clear indicator to show that the load is approaching the maximum resistance. If a project fulfils all general conditions, a financial risk analysis is necessary to find out whether the Observational Method is profitable. The success of implementation varies strongly per geotechnical discipline. In this article a simplified approach for a risk analysis is given and a number of geotechnical cases are discussed for which the Observational Method can lead to a financial profit. Most of these cases are already informally implemented in daily practice.

【 授权许可】

Unknown   

【 预 览 】
附件列表
Files Size Format View
RO201912010227565ZK.pdf 225KB PDF download
  文献评价指标  
  下载次数:6次 浏览次数:14次