期刊论文详细信息
Journal of Sustainable Energy
ESTIMATION OF THE AMOUNT OF ELECTRIC ENERGY GENERATABLE PER YEAR USING RAIN ACCUMULATED WATER FROM ABOH AND AHIAZU MBAISE TO DRIVE A HYDRO TURBINE IN FUTO, NIGERIA
OHAJIANYA A. C.1 
关键词: flooding;    global warming;    rainwater;    electric;    power;    google map;   
DOI  :  
学科分类:能源(综合)
来源: Editura Universitatii din Oradea / University of Oradea Publishing House
PDF
【 摘 要 】

Flooding, which is now a yearly occurrencein most parts of the World, can be minimized ifreservoirs are constructed at suitable locations to storerain accumulated water for the purpose of irrigationor electric power generation. In that light, we haveestimated the amount of electric energy that can begenerated using rain accumulated water from Abohand Ahiazu Mbaise in Imo State, Nigeria to drive ahydro turbine in the Federal University ofTechnology, Owerri, Nigeria. This was done using therainfall data of Mbaise, accessed fromwww.worldweatheronline.com; the land area of Abohand Ahiazu Mbaise, measured with the help of Googlemap; and the average altitude difference of FUTO andthe reservoir site at Aboh Mbaise, determined with thehelp of Google topographic map. It was estimated thata total of 9.7 GWh of electricity can be generated peryear if 100% of rainwater from Aboh and AhiazuMbaise is accumulated and used to drive a hydroturbine in FUTO. This is equivalent to 406 days of 10MW of electric power. If 30% of the rainwater isaccumulated instead, a total of 2.9 GWh of electricitycan be generated per year, which is equivalent to 122days of 10 MW of electric power.

【 授权许可】

Unknown   

【 预 览 】
附件列表
Files Size Format View
RO201910286090689ZK.pdf 332KB PDF download
  文献评价指标  
  下载次数:16次 浏览次数:23次