期刊论文详细信息
The Journal of Engineering
Capacity guaranteed control method for air conditioning cluster joining power grid frequency regulation
Zihao Li1  Wenchuan Wu2 
[1] Department of Electrical Engineering , Tsinghua University , Beijing , People's Republic of China
关键词: buildings;    power grid frequency regulation;    secondary frequency control;    AC aggregations;    AC cluster;    houses;    secondary frequency regulation service;    primary frequency control;    air conditioning cluster;    virtual power plant;    load frequency control;    heuristic simulated search algorithm;   
DOI  :  10.1049/joe.2018.8348
学科分类:工程和技术(综合)
来源: IET
PDF
【 摘 要 】

For the thermal inertia of houses and buildings, air conditioning (AC) cluster shows the potential in load frequency control. In this study, the authors propose a complete control framework for friendly accepting ACs to participate in secondary frequency regulation service without causing discomfort. An aggregator is hired to continually estimate the regulation capacity of ACs cluster by a heuristic simulated search algorithm, which could be guaranteed in a given duration. The external characteristics of the AC aggregations are set like a virtual power plant, which takes a droop curve for primary frequency control and a translation character for secondary frequency control. Simulation shows the capability for AC aggregations in load frequency control.

【 授权许可】

CC BY   

【 预 览 】
附件列表
Files Size Format View
RO201910254149705ZK.pdf 3270KB PDF download
  文献评价指标  
  下载次数:7次 浏览次数:31次