Energy Informatics
Application of an optimization-based curtailment service provider in real-time simulation
Zita Vale1  Pedro Faria2  Omid Abrishambaf3 
[1] Polytechnic of Porto (ISEP/IPP), Porto, Portugal;Research Group on Intelligent Engineering and Computing for Advanced Innovation and Development, Institute of Engineering –GECAD –
关键词: Demand response;    Curtailment service provider;    Real-time simulation;    Hardware-in-the-loop;    Optimization;   
DOI  :  10.1186/s42162-018-0006-6
学科分类:计算机网络和通讯
来源: Springer
PDF
【 摘 要 】

The use of demand response programs and distributed renewable energy resources are intensively discussed. These concepts play a key role in the distribution network, especially smart grids and microgrids. Nowadays, most of the implemented demand response programs are considered for large-scale resources, which make small and medium resources unable to participate in electricity market negotiations. In order to overcome this barrier, a third-party entity, namely an aggregator, can be considered as an intermediate player between the demand side and grid side. For this purpose, curtailment service provider is considered as an aggregator, which aggregates small and medium-scale resources, who do not have adequate capacity of reduction or generation and allow them to participate in wholesale electricity markets as a unique resource. However, before massive implementation of business models, the performance of the curtailment service provider should be adequately surveyed and validated in order to prevent future problems. This paper proposes a real-time simulation model of a curtailment service provider, which employs several real and laboratory hardware equipment considered as hardware-in-the-loop in the real-time simulator. Furthermore, an optimization problem is developed for a curtailment service provider in order to optimally schedule the available resources including several demand response programs and distributed renewable resources, aiming at minimizing its operation costs. The implemented case study considers a distribution network with 20 consumers and prosumers, and 26 renewable-based producers including wind and photovoltaic generation, where the developed model is performed in real-time for 12 min and behaviors of small and medium prosumers and producers is surveyed.

【 授权许可】

CC BY   

【 预 览 】
附件列表
Files Size Format View
RO201904026037673ZK.pdf 2508KB PDF download
  文献评价指标  
  下载次数:68次 浏览次数:22次