期刊论文详细信息
European Journal of Inflammation
Crestal Bone Remodeling around Platform Switched, Immediately Loaded Implants Placed in Sites of Previous Failures:
A.Quaranta1 
关键词: bone maintenance;    immediate loading;    platform switching;    diagnostic imaging;    dental implants;    radiograph;   
DOI  :  10.1177/1721727X120100S222
学科分类:医学(综合)
来源: Sage Journals
PDF
【 摘 要 】

The possibility to insert immediately-loaded implants in post-extraction sites where previously inserted implants had failed and had never received a prosthesis has not been sufficiently studied to the present day. Only few articles in the literature address this problem. The aim of the present study was to evaluate crestal bone remodeling around implants with a platform-switched design inserted and loaded immediately after the failure of the previous implants. This study has a follow-up of 36 months. Failed implants that had never received a prosthesis have been removed in 68 patients. In the present study 10 patients, whose bone crest measured at least 8 mm in width, were selected and 16 immediately loaded implants with a platform-switched design and a sandblasted and acid etched SLA surface, (Winsix®, Biosaf srl, Italy) were placed. Statistically significant differences were observed in crestal bone remodeling between 12 and 36 months (p<0.05) and between 24 and 36 months (p<0.001), although no statistically significant differences were found between 12 and 24 months (p>0.05). The values of periodontal indices have sometimes been borderline, although they returned normal later on. The cumulative success-rate of all the 16 implants inserted was of 93.75%, while the survival rate was 100%. Results show that immediately loaded platform-switched implants are a practicable solution for the rehabilitation of sites of early failed implants.

【 授权许可】

CC BY-NC   

【 预 览 】
附件列表
Files Size Format View
RO201904025001798ZK.pdf 4631KB PDF download
  文献评价指标  
  下载次数:17次 浏览次数:17次