期刊论文详细信息
Archives of civil engineering
Scheduling of Job Resources in Multiunit Projects with the Use of Time I Cost Criteria
M. PodolskiPhD., Eng., Wroc?aw University of Technology, Faculty of Civil Engineering, Wyb. Wyspia?skiego 27, 50-370 Wroc?aw, PolandEmailOther articles by this author:De Gruyter OnlineGoogle Scholar1 
[1] PhD., Eng., Wroc?aw University of Technology, Faculty of Civil Engineering, Wyb. Wyspia?skiego 27, 50-370 Wroc?aw, Poland
关键词: Keywords: construction projects scheduling;    simulated annealing;    flow- shop;    optimization;    contractor selection;   
DOI  :  10.1515/ace-2015-0057
学科分类:建筑学
来源: Polska Akademia Nauk * Instytut Podstawowych Problemow Techniki / Polish Academy of Sciences, Institute of Fundamental Technological Research
PDF
【 摘 要 】

This paper presents a model of scheduling of multiunit construction project based on an NP-hard permutation flow shop problem, in which the considered criterion is the sum of the costs of the works’ execution of the project considering the time of the project as a constraint. It is also assumed that each job in the units constituting the project may be realized in up to three different ways with specific time and cost of execution. The optimization task relies on solving the problem with two different decision variables: the order of execution of units (permutation) and a set of ways to carry out the works in units. The task presented in the paper is performed with the use of a created algorithm which searches the space of solutions in which metaheuristic simulated annealing algorithm is used. The paper presents a calculation example showing the applicability of the model in the optimization of sub-contractors’ work in the construction project.

【 授权许可】

Unknown   

【 预 览 】
附件列表
Files Size Format View
RO201902180792808ZK.pdf 580KB PDF download
  文献评价指标  
  下载次数:2次 浏览次数:18次