期刊论文详细信息
International Journal of Advanced Robotic Systems
The Information-Related Time Loss on Construction Sites: A Case Study on Two Sites:
ShengXu1 
关键词: Information Loss;    Information Management;    Schedule;    Observation;    Waste;   
DOI  :  10.5772/58444
学科分类:自动化工程
来源: InTech
PDF
【 摘 要 】

Information management is essential in construction projects. Existing research has identified and discussed problems in communication and information transfer among different stakeholders, such as the loss of information caused by fragmentation and information islands. However, there are few statistics about the direct time waste caused by information loss arising from poor communication and information management. Existing surveys relying on self-reporting questionnaires and interviews often contain various biases. This paper presents a direct observation of two construction sites in China in relation to wasted time and the information flows in these time-wasting events. Analysis of the observation data provides objective and comprehensive statistics on time wasted due to inconsistent information, dislocation and ambiguity. This research also analyses the correlation between participants, information carriers, information loss and the amount of time wasted. Finally, the wasting of time is analysed from the perspective of information flows and problems that cannot be addressed by information technologies are discussed.

【 授权许可】

CC BY   

【 预 览 】
附件列表
Files Size Format View
RO201901237175223ZK.pdf 317KB PDF download
  文献评价指标  
  下载次数:7次 浏览次数:6次