期刊论文详细信息
Journal of Networks
Study on Application of Electromagnetic Tomography Advanced Geological Prediction in Tunnel Construction
关键词: Geological Structures;    Tunnel;    Projection Matrix;    Electromagnetic Tomography;    Electromagnetic Wave;   
Others  :  1016865
DOI  :  10.4304/jnw.9.8.2106-2113
PDF
【 摘 要 】

With the large-scale construction and rapid development of underground engineering, a large number of underground engineering construction, such as tunnel and subway emerged. The geological structure of the tunnel is complex and the roc is fragmented. The electromagnetic tomography is a new geophysical technique in the tunnel. This method has advantages such as high resolution, high reliability and obvious image characteristics. Therefore, to insure the safety of the construction and to eliminate geological disasters, the advanced prediction technology of electromagnetic wave in tunnel detection is applied. In the paper, the electromagnetic tomography was used to detect the Huangzhuang tunnel geological condition. Electromagnetic wave can effectively and safely guide the excavation of the tunnel section working surface in combination with reconstructed images and excavation technology. The tunnel is narrow and long, the complete projection method cannot be used, so the coefficient matrix formed by the electromagnetic tomography. Exploration technology is highly sparse, and the maximum coverage of the limited angle is only 30°. So it is very difficult to get the complete reconstruction in anomaly areas under these conditions with present studies. Through numerical value analysis, its horizontal projection matrix has high reliability and guidance, at the same time, it can be safe in the tunnel.

【 授权许可】

   
@ 2006-2014 by ACADEMY PUBLISHER – All rights reserved.

【 预 览 】
附件列表
Files Size Format View
20140829225211308.pdf 1034KB PDF download
  文献评价指标  
  下载次数:11次 浏览次数:7次