会议论文详细信息
| International Multi-Conference on Industrial Engineering and Modern technologies | |
| Without Fly Rock Blasting Technology of Railway Reconstruction | |
| Shevkun, E.B.^1 ; Leschinsky, A.V.^1 ; Piotrovich, A.A.^2 | |
| Department of Transport-Technological Systems in Construction and Mining, National Pacific University, 136, Tikhookeanskaya str., Khabarovsk | |
| 6800035, Russia^1 | |
| Construction Department, Far Eastern State Transport University, 47, Serysheva str., Khabarovsk | |
| 680021, Russia^2 | |
| 关键词: Confined space; Elastic element; Fly rocks; Hard rocks; Large delays; Railway track; | |
| Others : https://iopscience.iop.org/article/10.1088/1757-899X/463/2/022081/pdf DOI : 10.1088/1757-899X/463/2/022081 |
|
| 来源: IOP | |
PDF
|
|
【 摘 要 】
The paper considers the problem of hard rock blasting in confined space of railway reconstruction with widening of side-hill cuts or shelves. To ensure reliable blasting without fly rock to construct the secondary railway tracks, it is proposed to use a combination of borehole cushioned charge construction in overdrilling, large delays in explosive initiation, as well as installation of permeable convertible shelters from elastic elements.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| Without Fly Rock Blasting Technology of Railway Reconstruction | 510KB |
PDF