International Multi-Conference on Industrial Engineering and Modern technologies | |
The Housing Renovation Program and the Demolition of Five-Storey Buildings in Moscow | |
Oleynik, P.^1 ; Slavin, A.^1 | |
Moscow State University of Civil Engineering, Yaroslavskoe shosse, 26, Moscow, Russia^1 | |
关键词: Housing renovations; Housing stock; Residential building; | |
Others : https://iopscience.iop.org/article/10.1088/1757-899X/463/3/032098/pdf DOI : 10.1088/1757-899X/463/3/032098 |
|
来源: IOP | |
【 摘 要 】
The part of the Russian housing stock built during the first industrial era is analysed and the drawbacks are pointed out. The problem of the dilapidated housing in Moscow is discussed. Currently in Moscow, 1700 residential buildings of the first period of industrial housing were demolished during 20 years with a total area of 11 million square meters (dating to the period of April 2017 - 1722 residential buildings & 6/6,3million square meters) - some of them at the expense of the city budget and others by investors in construction. The program of the demolition for the period of 1995-2015 and the housing renovation program are given.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
The Housing Renovation Program and the Demolition of Five-Storey Buildings in Moscow | 203KB | download |