会议论文详细信息
2018 3rd International Conference on Insulating Materials, Material Application and Electrical Engineering
Discussion on design scheme of clock circuit in twin-core electricity meter
材料科学;无线电电子学;电工学
Tang, Dengping^1 ; Ding, Li^1 ; Li, Fan^1 ; Wei, Wei^1
State Grid Hubei Electric Power Company Measurement Center, Hubei Wuhan, China^1
关键词: Accurate measurement;    Clock circuits;    Design scheme;    Development directions;    Electricity meters;    Management functions;    Occurrence probability;    Voltage loss;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/452/3/032104/pdf
DOI  :  10.1088/1757-899X/452/3/032104
学科分类:材料科学(综合)
来源: IOP
PDF
【 摘 要 】

Electricity meter based on the IR46 standard can integrate accurate measurement and online upgrade of its management function. It is the development direction of smart electricity meter in the next generation. In this paper, a topology of twin-core electricity meter is proposed, which realizes the separation of MCU of metering and MCU of management. For the problem of voltage loss of clock battery of the smart electricity meter, the clock circuit of twin-core electricity meter is designed. The scheme of clock battery with lithium battery and supercapacitor is proposed. It can effectively reduce the occurrence probability of voltage loss of clock battery in field operation. It provides theoretical guidance for the clock circuit's design of smart electricity meter in the new generation.

【 预 览 】
附件列表
Files Size Format View
Discussion on design scheme of clock circuit in twin-core electricity meter 403KB PDF download
  文献评价指标  
  下载次数:27次 浏览次数:50次