3rd Annual Applied Science and Engineering Conference | |
Estimated software measurement base on use case for online admission system | |
工业技术;自然科学 | |
Kurniadi, D.^1 ; Mulyani, A.^1 ; Septiana, Y.^1 ; Aulawi, H.^2 | |
Department of Informatics, Sekolah Tinggi Teknologi Garut, Jalan Mayor Syamsu 1, Garut | |
44151, Indonesia^1 | |
Department of Industrial Engineering, Sekolah Tinggi Teknologi Garut, Jalan Mayor Syamsu 1, Garut | |
44151, Indonesia^2 | |
关键词: Effort Estimation; Environmental factors; Productivity development; Software development projects; Software Measurement; Software project; Technical factors; Use case points; | |
Others : https://iopscience.iop.org/article/10.1088/1757-899X/434/1/012062/pdf DOI : 10.1088/1757-899X/434/1/012062 |
|
来源: IOP | |
【 摘 要 】
This article aims to measure the size of the software Online Admission System using the method of Use Case Point (UCP). UCP method can help developers in the estimation of factor productivity development of software projects that include estimated time work, human resource needs, and the estimated cost of creating software. This method has the ability in providing the effort estimation approach which is needed to do a software development project. The measurement is carried out based on the number and complexity of software projects by analyzing the actor, use case, and a variety of technical factors as well as environmental factors. The result of the measurement is the software development project of online admission system belongs the medium category with the acquisition value of UCP 103.86, estimated cost 277,168,750 IDR and time work 1,454 hours.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
Estimated software measurement base on use case for online admission system | 613KB | download |