4th International Conference on Applied Materials and Manufacturing Technology | |
The design and optimization of an emerging pile coupling with application to drilled and PHC pipe cased piles | |
材料科学;机械制造 | |
Hu, Hesong^1 ; Zhao, Fan^1,2 ; Tang, Mengxiong^1 ; Zhang, Shuo^1,3 ; Chen, Hang^1,3 | |
Guangzhou Institute of Building Science Co., Ltd., Guangzhou | |
510440, China^1 | |
Faculty of Land Resource Engineering, Kunming University of Science and Technology, Kunming | |
650093, China^2 | |
School of Civil Engineering, Guangzhou University, Guangzhou | |
510006, China^3 | |
关键词: Bearing mechanisms; Construction efficiency; Design and optimization; Grouting pressure; Load-bearing capacity; Mechanical coupling; Practical engineering applications; Structural complexity; | |
Others : https://iopscience.iop.org/article/10.1088/1757-899X/423/1/012028/pdf DOI : 10.1088/1757-899X/423/1/012028 |
|
学科分类:材料科学(综合) | |
来源: IOP | |
【 摘 要 】
To overcome the unstable quality, poor durability of the commonly used welded couplings and structural complexity of existing mechanical couplings, an emerging coupling design with simple structure and higher construction efficiency, with application to the construction of drilling and PHC pipe cased piles, is proposed in this paper. The load bearing capacities of the proposed coupling meets well with the requirements of corresponding standards and specifications. Meanwhile, it makes the connection of the piles strictly sealed, which prevents the grouted cement slurry from permeating into the core of the pipe piles and thereby is beneficial to the maintenance of grouting pressure and quality. Finite element method is employed to reveal its bearing mechanism under different load conditions. The load bearing capacity of the above coupling made of steel with different grades is verified, and its main design parameters are optimized, which can provide theoretical basis for its practical engineering applications.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
The design and optimization of an emerging pile coupling with application to drilled and PHC pipe cased piles | 1302KB | download |