Construction method of improved process installation for kitchen and toilet pipeline | |
机械制造;材料科学;化学工业 | |
Hu, L.W.^1 ; Guo, F.L.^1 ; Wang, J.L.^1 | |
School of Management and Engineering, Qingdao University of Technology, No.2 middle Yangtze Road, Qingdao | |
266520, China^1 | |
关键词: Anti-seepage; Civil constructions; Construction method; Improved process; Pipe installation; Pipeline installation; | |
Others : https://iopscience.iop.org/article/10.1088/1757-899X/392/6/062067/pdf DOI : 10.1088/1757-899X/392/6/062067 |
|
学科分类:材料科学(综合) | |
来源: IOP | |
![]() |
【 摘 要 】
The traditional method of installation of kitchen and toilet pipes is to reserve holes on the floor when pouring concrete. Once the pipe installation is completed, use the template again to plug the hole. This traditional practice is extremely easy to cause the kitchen and toilet pipe root leakage, in order to achieve the effect of the anti-seepage, the construction method adopts the method of installing the embedded parts in advance, the embedded parts as the formal pipes, so as to achieve the purpose of anti-seepage. This technology accurately positions the embedded parts from various aspects and uses swim lane diagram technology to clarify the contents and responsibilities of civil construction and installation during pipeline installation.