会议论文详细信息
2018 3rd Asia Conference on Power and Electrical Engineering
Short-term hydro generation operation of cascade hydropower stations in Han River, China
能源学;电工学
Zhang, Rui^1 ; Wang, Xuemin^1 ; Yu, Shan^1 ; Zou, Qiang^1
Changjiang Survey, Planning Design and Research CO., LTD., Wuhan
430010, China^1
关键词: Cascade hydropower stations;    Comprehensive utilizations;    Electric connections;    Load characteristics;    Operation methods;    Peak load regulations;    Renewable energies;    Short-term operation;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/366/1/012004/pdf
DOI  :  10.1088/1757-899X/366/1/012004
来源: IOP
PDF
【 摘 要 】

Hydropower is a natural renewable energy with outstanding technological superiority in short-term operation. Short-term hydro generation operation (SHGO) requires not only lord dispatch in single station, but also the coordination of hydraulic and electric connection for different stations. In this paper, a coordinated peak shaving operation method of cascade hydropower stations is proposed. Firstly, regular pattern of peak load regulation is analyzed using the load characteristics of power grid. The daily power output of cascade hydropower stations should meet the needs of typical load pattern. In order to satisfy comprehensive utilizations of water resources, the outflow of each reservoir should be no less than the demand of water supply or irrigation. To verify the feasibility and effectiveness of the proposed method, an application of Pankou and Xiaoxuan cascade hydropower stations, located in Hanjiang River in China, is presented in this paper. Simulation results indicate that the proposed method can obtain the maximum peak shaving amplitudes and suggested peak shaving amplitudes at the same time, which satisfies different operation demands of cascade hydropower stations.

【 预 览 】
附件列表
Files Size Format View
Short-term hydro generation operation of cascade hydropower stations in Han River, China 549KB PDF download
  文献评价指标  
  下载次数:6次 浏览次数:52次