2017 2nd International Conference on Mechatronics and Electrical Systems | |
Optimization Scheduling Model for Wind-thermal Power System Considering the Dynamic penalty factor | |
机械制造;无线电电子学 | |
Peng, Siyu^1 ; Luo, Jianchun^2 ; Wang, Yunyu^2 ; Yang, Jun^2 ; Ran, Hong^2 ; Peng, Xiaodong^2 ; Huang, Ming^2 ; Liu, Wanyu^3 | |
State Grid Chongqing Electric Power Co. qi'Nan Power Supply Branch Company, Chongqing | |
401420, China^1 | |
State Grid Chongqing Electric Power Co. Wulong Power Supply Branch Company, Chongqing | |
408500, China^2 | |
School of Electrical Engineering and Information, Sichuan University, Chengdu | |
610065, China^3 | |
关键词: Case-studies; Dynamic economic dispatch; Optimization modeling; Optimization scheduling; Penalty factor; Power demands; Power System; Wind-thermal power systems; | |
Others : https://iopscience.iop.org/article/10.1088/1757-899X/339/1/012016/pdf DOI : 10.1088/1757-899X/339/1/012016 |
|
来源: IOP | |
【 摘 要 】
In this paper, a new dynamic economic dispatch model for power system is presented.Objective function of the proposed model presents a major novelty in the dynamic economic dispatch including wind farm: introduced the "Dynamic penalty factor", This factor could be computed by using fuzzy logic considering both the variable nature of active wind power and power demand, and it could change the wind curtailment cost according to the different state of the power system. Case studies were carried out on the IEEE30 system. Results show that the proposed optimization model could mitigate the wind curtailment and the total cost effectively, demonstrate the validity and effectiveness of the proposed model.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
Optimization Scheduling Model for Wind-thermal Power System Considering the Dynamic penalty factor | 655KB | download |