会议论文详细信息
International Conference on Industrial and Systems Engineering 2017
Effective production planning for purchased part under long lead time and uncertain demand: MRP Vs demand-driven MRP
Shofa, M.J.^1 ; Moeis, A.O.^2 ; Restiana, N.^3
Department of Industrial Engineering, University of Serang Raya, Indonesia^1
Department of Industrial Engineering, University of Indonesia, Indonesia^2
PT Krakatau Steel Tbk, Indonesia^3
关键词: Customer demands;    Demand uncertainty;    Demand-driven;    Long leads;    Production Planning;    Production planning systems;    Production system;    Uncertain demand;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/337/1/012055/pdf
DOI  :  10.1088/1757-899X/337/1/012055
来源: IOP
PDF
【 摘 要 】

MRP as a production planning system is appropriate for the deterministic environment. Unfortunately, most production systems such as customer demands are stochastic, so that MRP is inappropriate at the time. Demand-Driven MRP (DDMRP) is new approach for production planning system dealing with demand uncertainty. The objective of this paper is to compare the MRP and DDMRP for purchased part under long lead time and uncertain demand in terms of average inventory levels. The evaluation is conducted through a discrete event simulation with the long lead time and uncertain demand scenarios. The next step is evaluating the performance of DDMRP by comparing the inventory level of DDMRP with MRP. As result, DDMRP is more effective production planning than MRP in terms of average inventory levels.

【 预 览 】
附件列表
Files Size Format View
Effective production planning for purchased part under long lead time and uncertain demand: MRP Vs demand-driven MRP 691KB PDF download
  文献评价指标  
  下载次数:45次 浏览次数:20次