会议论文详细信息
International Conference on Industrial and Systems Engineering 2017
Determining optimal preventive maintenance interval for component of Well Barrier Element in an Oil & Gas Company
Siswanto, A.^1 ; Kurniati, N.^2
Department of Management Technology, Institut Teknologi Sepuluh Nopember, Surabaya, Indonesia^1
Department of Industrial Engineering, Institut Teknologi Sepuluh Nopember, Kampus ITS, Sukolilo-Surabaya
60111, Indonesia^2
关键词: Corrective maintenance;    Cost of maintenance;    Current practices;    Oil and gas companies;    Optimal preventive maintenance;    Preventive maintenance (pm);    Reliability-based;    Surface-controlled subsurface safety valves;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/337/1/012066/pdf
DOI  :  10.1088/1757-899X/337/1/012066
来源: IOP
PDF
【 摘 要 】

An oil and gas company has 2,268 oil and gas wells. Well Barrier Element (WBE) is installed in a well to protect human, prevent asset damage and minimize harm to the environment. The primary WBE component is Surface Controlled Subsurface Safety Valve (SCSSV). The secondary WBE component is Christmas Tree Valves that consist of four valves i.e. Lower Master Valve (LMV), Upper Master Valve (UMV), Swab Valve (SV) and Wing Valve (WV). Current practice on WBE Preventive Maintenance (PM) program is conducted by considering the suggested schedule as stated on manual. Corrective Maintenance (CM) program is conducted when the component fails unexpectedly. Both PM and CM need cost and may cause production loss. This paper attempts to analyze the failure data and reliability based on historical data. Optimal PM interval is determined in order to minimize the total cost of maintenance per unit time. The optimal PM interval for SCSSV is 730 days, LMV is 985 days, UMV is 910 days, SV is 900 days and WV is 780 days. In average of all components, the cost reduction by implementing the suggested interval is 52%, while the reliability is improved by 4% and the availability is increased by 5%.

【 预 览 】
附件列表
Files Size Format View
Determining optimal preventive maintenance interval for component of Well Barrier Element in an Oil & Gas Company 428KB PDF download
  文献评价指标  
  下载次数:23次 浏览次数:31次