4th Asia Pacific Conference on Manufacturing Systems; 3rd International Manufacturing Engineering Conference | |
Reliability Centred Maintenance (RCM) Analysis of Laser Machine in Filling Lithos at PT X | |
Suryono, M.A.E.^1 ; Rosyidi, C.N.^1 | |
Department of Industrial Engineering, Universitas Sebelas Maret, Indonesia^1 | |
关键词: Analysis tools; Automated machines; Critical component; Critical machine; Maintenance tasks; Optimal inspection; Reliability centred maintenances; Risk Priority Number; | |
Others : https://iopscience.iop.org/article/10.1088/1757-899X/319/1/012020/pdf DOI : 10.1088/1757-899X/319/1/012020 |
|
来源: IOP | |
【 摘 要 】
PT. X used automated machines which work for sixteen hours per day. Therefore, the machines should be maintained to keep the availability of the machines. The aim of this research is to determine maintenance tasks according to the cause of component's failure using Reliability Centred Maintenance (RCM) and determine the amount of optimal inspection frequency which must be performed to the machine at filling lithos process. In this research, RCM is used as an analysis tool to determine the critical component and find optimal inspection frequencies to maximize machine's reliability. From the analysis, we found that the critical machine in filling lithos process is laser machine in Line 2. Then we proceed to determine the cause of machine's failure. Lastube component has the highest Risk Priority Number (RPN) among other components such as power supply, lens, chiller, laser siren, encoder, conveyor, and mirror galvo. Most of the components have operational consequences and the others have hidden failure consequences and safety consequences. Time-directed life-renewal task, failure finding task, and servicing task can be used to overcome these consequences. The results of data analysis show that the inspection must be performed once a month for laser machine in the form of preventive maintenance to lowering the downtime.
【 预 览 】