会议论文详细信息
TALENTA - Conference on Engineering, Science and Technology 2017
Design of preventive maintenance system using the reliability engineering and maintenance value stream mapping methods in PT. XYZ
工业技术;自然科学
Sembiring, N.^1 ; Panjaitan, N.^1 ; Angelita, S.^1
Department of Industrial Engineering, Faculty of Engineering, Universitas Sumatera Utara, Medan
20155, Indonesia^1
关键词: Component replacement;    Corrective maintenance;    Maintenance efficiency;    Mean time to repairs;    Nongovernmental organizations;    Optimal productivity;    Reliability engineering;    Value stream mapping;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/309/1/012128/pdf
DOI  :  10.1088/1757-899X/309/1/012128
来源: IOP
PDF
【 摘 要 】

PT. XYZ is a company owned by non-governmental organizations engaged in the field of production of rubber processing becoming crumb rubber. Part of the production is supported by some of machines and interacting equipment to achieve optimal productivity. Types of the machine that are used in the production process are Conveyor Breaker, Breaker, Rolling Pin, Hammer Mill, Mill Roll, Conveyor, Shredder Crumb, and Dryer. Maintenance system in PT. XYZ is corrective maintenance i.e. repairing or replacing the engine components after the crash on the machine. Replacement of engine components on corrective maintenance causes the machine to stop operating during the production process is in progress. The result is in the loss of production time due to the operator must replace the damaged engine components. The loss of production time can impact on the production targets which were not reached and lead to high loss costs. The cost for all components is Rp. 4.088.514.505. This cost is really high just for maintaining a Mill Roll Machine. Therefore PT. XYZ is needed to do preventive maintenance i.e. scheduling engine components and improving maintenance efficiency. The used methods are Reliability Engineering and Maintenance Value Stream Mapping (MVSM). The needed data in this research are the interval of time damage to engine components, opportunity cost, labor cost, component cost, corrective repair time, preventive repair time, Mean Time To Opportunity (MTTO), Mean Time To Repair (MTTR), and Mean Time To Yield (MTTY). In this research, the critical components of Mill Roll machine are Spier, Bushing, Bearing, Coupling and Roll. Determination of damage distribution, reliability, MTTF, cost of failure, cost of preventive, current state map, and future state map are done so that the replacement time for each critical component with the lowest maintenance cost and preparation of Standard Operation Procedure (SOP) are developed. For the critical component that has been determined, the Spier component replacement time interval is 228 days with a reliability value of 0,503171, Bushing component is 240 days with reliability value of 0.36861, Bearing component is 202 days with reliability value of 0,503058, Coupling component is 247 days with reliability value of 0,50108 and Roll component is 301 days with reliability value of 0,373525. The results show that the cost decreases from Rp 300,688,114 to Rp 244,384,371 obtained from corrective maintenance to preventive maintenance. While maintenance efficiency increases with the application of preventive maintenance i.e. for Spier component from 54,0540541% to 74,07407%, Bushing component from 52,3809524% to 68,75%, Bearing component from 40% to 52,63158%, Coupling component from 60.9756098% to 71.42857%, and Roll components from 64.516129% to 74.7663551%.

【 预 览 】
附件列表
Files Size Format View
Design of preventive maintenance system using the reliability engineering and maintenance value stream mapping methods in PT. XYZ 440KB PDF download
  文献评价指标  
  下载次数:11次 浏览次数:18次