会议论文详细信息
10th International Conference Numerical Analysis in Engineering
The decline of soil due to the pile of highway project Medan-Kualanamu (STA 35 + 901) with the finite element method
数学;工业技术
Hastuty, I.P.^1 ; Roesyanto^1 ; Sihite, A.B.^1
Department of Civil Engineering, Universitas Sumatera Utara, Medan, Indonesia^1
关键词: Analytical calculation;    Highway projects;    Pore-water pressures;    Prefabricated vertical drains;    Sand columns;    Soft soils;    Soil consolidation;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/308/1/012008/pdf
DOI  :  10.1088/1757-899X/308/1/012008
学科分类:工业工程学
来源: IOP
PDF
【 摘 要 】

Consolidation is the process of discharge of water from the ground through the pore cavity. Consolidation occurs in soft soil or unstable soil that allows an improvement in order to make the soil more stable. The method of using Prefabricated Vertical Drain (PVD) is one way to improve unstable soils. PVD works like a sand column that can drain water vertically. This study aims to determine the decrease, pore water pressure and soil consolidation rate with Prefabricated Vertical Drain (PVD) and without PVD analytically and using finite element method that affect the duration of soil decline to reach 90% consolidation or in other words soil does not decline anymore. Based on the analytical calculation, the decrease obtained is equal to 0.47 m meanwhile the result of calculation using finite element method is 0.45 m. The consolidation rate obtained from analytical calculation is 19 days with PVD and 115 days without PVD. The consolidation rate obtained from finite element method is 63 days with PVD and 110 days without PVD. And the pore water pressure is 0.92 KN/m2.

【 预 览 】
附件列表
Files Size Format View
The decline of soil due to the pile of highway project Medan-Kualanamu (STA 35 + 901) with the finite element method 1073KB PDF download
  文献评价指标  
  下载次数:10次 浏览次数:25次