10th International Conference Numerical Analysis in Engineering | |
Identifying strengths and weaknesses of Quality Management Unit University of Sumatera Utara software using SCAMPI C | |
数学;工业技术 | |
Gunawan, D.^1 ; Amalia, A.^2 ; Rahmat, R.F.^1 ; Muchtar, M.A.^1 ; Siregar, I.^3 | |
Department of Information Technology, Universitas Sumatera Utara, Kampus USU, Jl. dr. Mansur No. 9, Medan | |
20155, Indonesia^1 | |
Department of Computer Science, Universitas Sumatera Utara, Kampus USU, Jl. dr. Mansur No. 9, Medan | |
20155, Indonesia^2 | |
Department of Industrial Engineering, Universitas Sumatera Utara, Kampus USU, Jl. dr. Mansur No. 9, Medan | |
20155, Indonesia^3 | |
关键词: Appraisal method; Planning projects; Process Improvement; Project monitoring and control; Project planning; Requirements management; Software capability; Software maturities; | |
Others : https://iopscience.iop.org/article/10.1088/1757-899X/308/1/012001/pdf DOI : 10.1088/1757-899X/308/1/012001 |
|
学科分类:工业工程学 | |
来源: IOP | |
【 摘 要 】
Identification of software maturity level is a technique to determine the quality of the software. By identifying the software maturity level, the weaknesses of the software can be observed. As a result, the recommendations might be a reference for future software maintenance and development. This paper discusses the software Capability Level (CL) with case studies on Quality Management Unit (Unit Manajemen Mutu) University of Sumatera Utara (UMM-USU). This research utilized Standard CMMI Appraisal Method for Process Improvement class C (SCAMPI C) model with continuous representation. This model focuses on activities for developing quality products and services. The observation is done in three process areas, such as Project Planning (PP), Project Monitoring and Control (PMC), and Requirements Management (REQM). According to the measurement of software capability level for UMM-USU software, turns out that the capability level for the observed process area is in the range of CL1 and CL2. Planning Project (PP) is the only process area which reaches capability level 2, meanwhile, PMC and REQM are still in CL 1 or in performed level. This research reveals several weaknesses of existing UMM-USU software. Therefore, this study proposes several recommendations for UMM-USU to improve capability level for observed process areas.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
Identifying strengths and weaknesses of Quality Management Unit University of Sumatera Utara software using SCAMPI C | 156KB | download |