会议论文详细信息
8th TSME-International Conference on Mechanical Engineering
Improvement for enhancing effectiveness of universal power system (UPS) continuous testing process
Sriratana, Lerdlekha^1
Faculty of Engineering, Ramkhamhaeng University, Huamark, Bangkapi, Bangkok
10240, Thailand^1
关键词: Continuous testing;    Efficiency of testing;    Job scheduling;    Overall efficiency;    Reducing waste;    Standard time;    Testing process;    Work scheduling;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/297/1/012064/pdf
DOI  :  10.1088/1757-899X/297/1/012064
来源: IOP
PDF
【 摘 要 】

This experiment aims to enhance the effectiveness of the Universal Power System (UPS) continuous testing process of the Electrical and Electronic Institute by applying work scheduling and time study methods. Initially, the standard time of testing process has not been considered that results of unaccurate testing target and also time wasting has been observed. As monitoring and reducing waste time for improving the efficiency of testing process, Yamazumi chart and job scheduling theory (North West Corner Rule) were applied to develop new work process. After the improvements, the overall efficiency of the process possibly increased from 52.8% to 65.6% or 12.7%. Moreover, the waste time could reduce from 828.3 minutes to 653.6 minutes or 21%, while testing units per batch could increase from 3 to 4 units. Therefore, the number of testing units would increase from 12 units up to 20 units per month that also contribute to increase of net income of UPS testing process by 72%.

【 预 览 】
附件列表
Files Size Format View
Improvement for enhancing effectiveness of universal power system (UPS) continuous testing process 586KB PDF download
  文献评价指标  
  下载次数:12次 浏览次数:39次