会议论文详细信息
2nd Annual Applied Science and Engineering Conference
Improving Assembly Line Balancing Using Moodie Young Methods on Dump Truck Production
工业技术;自然科学
Syahputri, K.^1 ; Sari, R.M.^1 ; Anizar^1 ; Rizkya, I.^1 ; Leviza, J.^1 ; Siregar, I.^1
Universitas Sumatera Utara, Jalan Almamater Kampus USU, Padang-Bulan Medan
20155, Indonesia^1
关键词: Assembly line balancing;    Completion time;    Delivery of goods;    Line efficiency;    Loading and unloading;    Method of lines;    Smoothness indices;    Transportation equipments;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/288/1/012090/pdf
DOI  :  10.1088/1757-899X/288/1/012090
来源: IOP
PDF
【 摘 要 】

Dump truck is a transportation equipment to facilitate the process of loading and unloading. The company has 7 work stations different cycles time. The difference in cycle time at each work station causes a bottleneck on the line balancing production. The bottleneck occurring in the line balancing production causes a delay in the completion of the product. Delays in delivery of goods certainly gives a bad impact to the company. Therefore, companies need to balance the line balancing production to reduce bottlenecks that cause delayed product completion time. Bottleneck minimization will increase the efficiency of the assembly line balancing. Line balancing aims to obtain a smooth flow of production that resulting maximum line balancing efficiency. One method of line balancing is by using Moodie Young method. The result of the calculation with Moodie Young method obtains an increase of line efficiency by 75% from the actual method. This method is also reduce balance delay from 53.86% to 19.18% the decline in smoothness index to be 597,57. It can be concluded that the Moodie Young Method is better than the actual method.

【 预 览 】
附件列表
Files Size Format View
Improving Assembly Line Balancing Using Moodie Young Methods on Dump Truck Production 600KB PDF download
  文献评价指标  
  下载次数:16次 浏览次数:39次