Upgrade of the cryogenic infrastructure of SM18, CERN main test facility for superconducting magnets and RF cavities
材料科学;物理学
Perin, A.^1 ; Dhalla, F.^1 ; Gayet, P.^1 ; Serio, L.^1
CERN, Technology Department, Geneva 23
1211, Switzerland^1
关键词: Current configuration;    Implementation strategies;    RF cavities;    Super-conducting accelerator magnets;    Superconducting RF cavity;    Test program;    Testing requirements;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/278/1/012112/pdf
DOI  :  10.1088/1757-899X/278/1/012112
学科分类:材料科学(综合)
来源: IOP
PDF
【 摘 要 】

SM18 is CERN main facility for testing superconducting accelerator magnets and superconducting RF cavities. Its cryogenic infrastructure will have to be significantly upgraded in the coming years, starting in 2019, to meet the testing requirements for the LHC High Luminosity project and for the R&D program for superconducting magnets and RF equipment until 2023 and beyond. This article presents the assessment of the cryogenic needs based on the foreseen test program and on past testing experience. The current configuration of the cryogenic infrastructure is presented and several possible upgrade scenarios are discussed. The chosen upgrade configuration is then described and the characteristics of the main newly required cryogenic equipment, in particular a new 35 g/s helium liquefier, are presented. The upgrade implementation strategy and plan to meet the required schedule are then described.