10th International Seminar on Industrial Engineering and Management "Sustainable Development In Industry and Management" | |
Design local exhaust ventilation on sieve machine at PT.Perkebunan Nusantara VIII Ciater using design for assembly (DFA) approach with Boothroyd and Dewhurst method | |
Khalqihi, K.I.^1 ; Rahayu, M.^1 ; Rendra, M.^1 | |
Telkom University, Bandung, Indonesia^1 | |
关键词: Assembly process; Assembly time; Design for assembly; Efficiency levels; Local exhaust ventilation; Maintenance process; Production process; Workhours; | |
Others : https://iopscience.iop.org/article/10.1088/1757-899X/277/1/012011/pdf DOI : 10.1088/1757-899X/277/1/012011 |
|
来源: IOP | |
【 摘 要 】
PT Perkebunan Nusantara VIII Ciater is a company produced black tea orthodox more or less 4 tons every day. At the production section, PT Perkebunan Nusantara VIII will use local exhaust ventilation specially at sortation area on sieve machine. To maintain the quality of the black tea orthodox, all machine must be scheduled for maintenance every once a month and takes time 2 hours in workhours, with additional local exhaust ventilation, it will increase time for maintenance process, if maintenance takes time more than 2 hours it will caused production process delayed. To support maintenance process in PT Perkebunan Nusantara VIII Ciater, designing local exhaust ventilation using design for assembly approach with Boothroyd and Dewhurst method, design for assembly approach is choosen to simplify maintenance process which required assembly process. There are 2 LEV designs for this research. Design 1 with 94 components, assembly time 647.88 seconds and assembly efficiency level 23.62%. Design 2 with 82 components, assembly time 567.84 seconds and assembly efficiency level 24.83%. Design 2 is choosen for this research based on DFA goals, minimum total part that use, optimization assembly time, and assembly efficiency level.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
Design local exhaust ventilation on sieve machine at PT.Perkebunan Nusantara VIII Ciater using design for assembly (DFA) approach with Boothroyd and Dewhurst method | 378KB | download |