10th International Seminar on Industrial Engineering and Management "Sustainable Development In Industry and Management" | |
Mental workload measurement in operator control room using NASA-TLX | |
Sugarindra, M.^1 ; Suryoputro, M.R.^1 ; Permana, A.I.^1 | |
Universitas Islam Indonesia, Jl. Kaliurang, Km, 14,5 DI., Yogyakarta, Indonesia^1 | |
关键词: Central control; Degree of validity; Mental workload; NASA-TLX; Operator control; Physical demand; Physical workloads; Processing units; | |
Others : https://iopscience.iop.org/article/10.1088/1757-899X/277/1/012022/pdf DOI : 10.1088/1757-899X/277/1/012022 |
|
来源: IOP | |
【 摘 要 】
The workload, encountered a combination of physical workload and mental workload, is a consequence of the activities for workers. Central control room is one department in the oil processing company, employees tasked with monitoring the processing unit for 24 hours nonstop with a combination of 3 shifts in 8 hours. NASA-TLX (NASA Task Load Index) is one of the subjective mental workload measurement using six factors, namely the Mental demand (MD), Physical demand (PD), Temporal demand (TD), Performance (OP), Effort (EF), frustration levels (FR). Measurement of a subjective mental workload most widely used because it has a high degree of validity. Based on the calculation of the mental workload, there at 5 units (DTU, NPU, HTU, DIST and OPS) at the control chamber (94; 83.33; 94.67; 81, 33 and 94.67 respectively) that categorize as very high mental workload. The high level of mental workload on the operator in the Central Control Room is a requirement to have high accuracy, alertness and can make decisions quickly.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
Mental workload measurement in operator control room using NASA-TLX | 470KB | download |