会议论文详细信息
Global Congress on Construction, Material and Structural Engineering 2017
Minimizing delays in the Jordanian construction industry by adopting BIM technology
材料科学;土木建筑工程
Btoush, M.^1 ; Harun, A.T.^1
Faculty of Civil Engineering and Earth Resources, University Malaysia Pahang, Lebuhraya Tun Razak, Pahang, Gambang
26300, Malaysia^1
关键词: BIM technologies;    Building Information Modelling;    Causes of delays;    Construction projects;    Gross domestic products;    Jordanian construction industry;    Minimizing delays;    Scheduling and planning;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/271/1/012041/pdf
DOI  :  10.1088/1757-899X/271/1/012041
来源: IOP
PDF
【 摘 要 】

The Jordanian construction industry plays a significant role and contributes immensely to the gross domestic product (GDP) of the economy. However, the Jordanian public work and housing ministry and most industry players including engineers and contractors have reported that most of the projects experience delays which lead time and cost overruns, and extra efforts. The main causes of delays identified by researchers include poor scheduling and planning, change orders, site conditions, weather, late deliveries, incompetent technical staff. To address these challenges, the implementation of building information modelling (BIM) is paramount. This paper presents BIM as a powerful tool for reducing delays in Jordan construction projects. The paper focuses on two main parts; the first part involves the identification of the major causes of delays, and the second part is to accurately outline the roles and responsibilities of BIM specialist in construction projects. Finally, the paper matches the roles and responsibilities of BIM specialist and the causes of delays, and how the delays are addressed through BIM specialist.

【 预 览 】
附件列表
Files Size Format View
Minimizing delays in the Jordanian construction industry by adopting BIM technology 360KB PDF download
  文献评价指标  
  下载次数:14次 浏览次数:44次