Analysis of extreme values of the economic efficiency indicators of transport infrastructure projects
Korytárová, J.^1 ; Vaková, L.^1
Brno Univerzity of Technology, Faculty of Civil Engineering, Institute of Structural Economics and Management, Veveí 331/95, Brno
602 00, Czech Republic^1
关键词: Accident costs;    Agency costs;    Basic variables;    Economic efficiency;    Extreme value;    Input variables;    Investment Options;    Transport infrastructure;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/251/1/012043/pdf
DOI  :  10.1088/1757-899X/251/1/012043
来源: IOP
PDF
【 摘 要 】
Paper builds on previous research of the authors into the evaluation of economic efficiency of transport infrastructure projects evaluated by the economic efficiency ratio-NPV, IRR and BCR. Values of indicators and subsequent outputs of the sensitivity analysis show extremely favourable values in some cases. The authors dealt with the analysis of these indicators down to the level of the input variables and examined which inputs have a larger share of these extreme values. NCF for the calculation of above mentioned ratios is created by benefits that arise as the difference between zero and investment options of the project (savings in travel and operating costs, savings in travel time costs, reduction in accident costs and savings in exogenous costs) as well as total agency costs. Savings in travel time costs which contribute to the overall utility of projects by more than 70% appear to be the most important benefits in the long term horizon. This is the reason why this benefit emphasized. The outcome of the article has resulted how the particular basic variables contributed to the total robustness of economic efficiency of these project.