会议论文详细信息
3rd Annual International Workshop on Materials Science and Engineering
Environment Impact Analysis of Shield Passing Alongside Bridge Pile Platform Using Three Dimensional Numerical Simulation
Shang, Yanliang^1,2 ; Shi, Wenjun^2 ; Han, Tongyin^3 ; Qin, Zhichao^2 ; Du, Shouji^1
Department of Civil Engineering, Shanghai Jiao Tong University, Shanghai
200240, China^1
School of Civil Engineering Shijiazhuang, Tie Dao University, Shijiazhuang
050043, China^2
Langfang Teachers University, Langfang
065000, China^3
关键词: Design strength;    Environment impact;    Foundation modeling;    Internal forces;    Maximum surface settlements;    Shield construction;    Three-dimensional numerical simulations;    Urban subway tunnel;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/250/1/012031/pdf
DOI  :  10.1088/1757-899X/250/1/012031
来源: IOP
PDF
【 摘 要 】
The shield method has many advantages in the construction of urban subway, and has become the preferred method for the construction of urban subway tunnel. Taking Shijiazhuang metro line 3 (administrative center station - garden park station interval) Passing alongside bridge as the engineering background, double shield crossing the bridge pile foundation model was set up. The deformation and internal force of the pile foundation during the construction of the shield were analyzed. Pile stress caused by shield construction increases, but the maximum stress is less than the design strength; the maximum surface settlement caused by the construction of 10.2 mm, the results meet the requirements of construction.
【 预 览 】
附件列表
Files Size Format View
Environment Impact Analysis of Shield Passing Alongside Bridge Pile Platform Using Three Dimensional Numerical Simulation 428KB PDF download
  文献评价指标  
  下载次数:10次 浏览次数:52次