| Preliminary Evaluation of BIM-based Approaches for Schedule Delay Analysis | |
| 土木建筑工程 | |
| Chou, Hui-Yu^1 ; Yang, Jyh-Bin^2 | |
| 168, Jifeng E. Rd., Wufeng District, Taichung | |
| 41349, Taiwan^1 | |
| No. 300, Zhongda Rd., Zhongli District, Taoyuan City | |
| 32001, Taiwan^2 | |
| 关键词: Analytical results; Building Information Model; BIM; Construction projects; Innovative techniques; Literature reviews; Research results; Schedule delay; Schedule-delay analysis; | |
| Others : https://iopscience.iop.org/article/10.1088/1757-899X/245/6/062048/pdf DOI : 10.1088/1757-899X/245/6/062048 |
|
| 学科分类:土木及结构工程学 | |
| 来源: IOP | |
PDF
|
|
【 摘 要 】
The problem of schedule delay commonly occurs in construction projects. The quality of delay analysis depends on the availability of schedule-related information and delay evidence. More information used in delay analysis usually produces more accurate and fair analytical results. How to use innovative techniques to improve the quality of schedule delay analysis results have received much attention recently. As Building Information Modeling (BIM) technique has been quickly developed, using BIM and 4D simulation techniques have been proposed and implemented. Obvious benefits have been achieved especially in identifying and solving construction consequence problems in advance of construction. This study preforms an intensive literature review to discuss the problems encountered in schedule delay analysis and the possibility of using BIM as a tool in developing a BIM-based approach for schedule delay analysis. This study believes that most of the identified problems can be dealt with by BIM technique. Research results could be a fundamental of developing new approaches for resolving schedule delay disputes.