【 摘 要 】
The Oviarsko twin-tube tunnel is part of the development of the Hriovské Podhradie - Lietavská Lúka section of the D1 motorway, running southwest of the ilina town. The D1 motorway overcomes the detached mass of an overthrust sheet and the western adge of the Paleogene fill of the ilina Basin through the Oviarsko tunnel. The 2T - 8 category is designated for the Oviarsko tunnel with the total length of the northern tunnel tube 2360 m and southern tunnel tube 2367 m. the tunnel orientation to the cardinals is on the west-east axis, the marking of tunnel portals and tunnels tubes is distinguished according to it. The design speed is 100 km/h, respectively 90 km/h under worsened weather conditions. Parts of the tunnel are three cross passages passable for vehicles and five cross passages passable for pedestrians, serving as protected escape routes. This report describes geotechnical monitoring, construction technology and procedures with respect to complicated geological conditions. The geological conditions require the operative approach of the project owner, contractor, designer and geologist to the optimum solution for the running of the tunnel construction.