2nd International Conference on Civil Engineering and Materials Science | |
Stimulating a Sustainable Construction through Holistic BIM Adoption: The Root Causes of Recurring Low BIM Adoption in Malaysia | |
Mamter, S.^1 ; Abdul-Aziz, A.R.^2 ; Mamat, M.E.^1 | |
Faculty of Architecture, Planning and Surveying, UiTM Perak, Seri Iskandar, Perak | |
32610, Malaysia^1 | |
School of Housing Building and Planning, Universiti Sains Malaysia, Pulau Pinang | |
11800, Malaysia^2 | |
关键词: Building Information Modelling; Competition strategy; Construction productivity; Semi structured interviews; Software integration; Sustainable construction; Sustainable strategies; Technology adoption; | |
Others : https://iopscience.iop.org/article/10.1088/1757-899X/216/1/012056/pdf DOI : 10.1088/1757-899X/216/1/012056 |
|
来源: IOP | |
【 摘 要 】
Fostering the Building Information Modelling (BIM) implementation is one of Malaysia sustainable strategies towards greener construction. Hence, the Eleventh Malaysia plan focuses on transforming construction industry through the increase of technology adoption in order to enhance construction productivity. Therefore, there is a growing and urgent demand to provide BIM competent. However, a significant number of parties are reluctant to develop and invest in BIM due to unsolved root causes. Scholars have identified barriers relating to the infancy stage of BIM adoption in Malaysia. Unfortunately, there is a lack of study to explore deeper the root causes of recurring for the barriers anticipate the low BIM adoption. This paper attempts to delve into the initiatives of BIM stake players in fostering BIM adoption and to determine the root causes of recurring barriers due to low BIM adoption. The study adopted the semi-structured interviews which involved BIM stake players as a sample population. From the findings, authors revealed four root causes of recurring barriers; absence of BIM policy and BIM compulsion, poor holistic readiness, software integration competition strategy, and reluctant in sharing knowledge. The findings espoused here are preliminary and more results are expected to emerge as the research progresses.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
Stimulating a Sustainable Construction through Holistic BIM Adoption: The Root Causes of Recurring Low BIM Adoption in Malaysia | 369KB | download |