| International Conference on Emerging Trends in Engineering Research | |
| Cast Off expansion plan by rapid improvement through Optimization tool design, Tool Parameters and using Six Sigma's ECRS Technique | |
| 工业技术;材料科学 | |
| Gopalakrishnan, T.^1 ; Saravanan, R.^2 | |
| Department of Mechanical Engineering, VELS University, Pallavaram, Tamil nadu, Chennai, India^1 | |
| Ellenki Institute of Engineering and Technology Hyderabad, Andra Pradesh, India^2 | |
| 关键词: Customer demands; Direct and indirect costs; Employee motivation; Expansion plans; Optimization tools; Production rates; Tool parameter; Tools and techniques; | |
| Others : https://iopscience.iop.org/article/10.1088/1757-899X/183/1/012016/pdf DOI : 10.1088/1757-899X/183/1/012016 |
|
| 来源: IOP | |
PDF
|
|
【 摘 要 】
Powerful management concepts step-up the quality of the product, time saving in producing the product thereby increase the production rate, improves tools and techniques, work culture, work place and employee motivation and morale. In this paper discussed about the case study of optimizing the tool design, tool parameters to cast off expansion plan according ECRS technique. The proposed designs and optimal tool parameters yielded best results and meet the customer demand without expansion plan. Hence the work yielded huge savings of money (direct and indirect cost), time and improved the motivation and more of employees significantly.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| Cast Off expansion plan by rapid improvement through Optimization tool design, Tool Parameters and using Six Sigma's ECRS Technique | 1799KB |
PDF