会议论文详细信息
1st Annual Applied Science and Engineering Conference
Identification and Waste Reduction on Rubber Industry
工业技术;自然科学
Syahputri, K.^1 ; Sari, R.M.^1 ; Rizkya, I.^1 ; Siregar, I.^1
Department of Industrial Engineering, Faculty of Engineering, University of Sumatera Utara, Indonesia^1
关键词: Daily activity;    Material handling;    Process activities;    Production process;    Transport activity;    Waste reduction;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/180/1/012119/pdf
DOI  :  10.1088/1757-899X/180/1/012119
来源: IOP
PDF
【 摘 要 】

Lots of activities in production process can be lead to waste activities. The waste may cause a degree of efficiency of an industry to be low. This research was conducted in the rubber industry. In the rubber industry has been a decline in the level of efficiency. Decreased levels of efficiency occurs because many inefficient activities that take place during the production process. Activities that were not contributed to the value of the product lead to waste during the production process. Identification by the activity is a way to minimize the waste that occurs so that the efficiency of the production process can be improved. Process activity mapping in the rubber industry used to identify the activities that take place on the floor of production in order to reduce waste and propose improvements that can be done to improve efficiency. The total waste that occurs in crumb rubber industry amounted to 94 minutes or 1.56 hours. For the proposed improvements in order to reduce waste are based on two activities, such as transport and unnecessary motion. Transport activities proposed use of material handling in their daily activities and to unnecessary motion by doing a variety of work on the operator.

【 预 览 】
附件列表
Files Size Format View
Identification and Waste Reduction on Rubber Industry 388KB PDF download
  文献评价指标  
  下载次数:35次 浏览次数:20次