会议论文详细信息
20th Innovative Manufacturing Engineering and Energy Conference
The use KPI's to determine the waste in production process
机械制造;能源学
Borsos, G.^1 ; Iacob, C.C.^1 ; Calefariu, G.^1
Department of Engineering and Industrial Management, Transylvania University of Brasov, Brasov
500174, Romania^1
关键词: Industrial companies;    Literature reviews;    Manufacturing activities;    Performance indicators;    Performance measurements;    Production process;    Theory and practice;    Value stream maps;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/161/1/012102/pdf
DOI  :  10.1088/1757-899X/161/1/012102
来源: IOP
PDF
【 摘 要 】

In theory and practice of management is well-known Lean approach about forms of waste from production processes (Muda) and the method VSM (Value Stream Map), one of the most effective methods for determining the activities generating value within industrial companies. It is also obvious concern of the specialists for performance measurement regardless of purview of the organizations. The literature review has shown that the link between performance indicators and the objectives of the companies is researched in detail. However, the correlation between indicators and the forms of waste that generate deviations from the setpoints is rather nature practical and it depends on the talent and managerial skills of those directing production processes. The paper presents the results of a applied study, performed by the authors, through which it was has sought to will create a system of performance indicators specific to manufacturing activity that to be a useful tool to quantify the losses and to determining ways to improve default losses.

【 预 览 】
附件列表
Files Size Format View
The use KPI's to determine the waste in production process 865KB PDF download
  文献评价指标  
  下载次数:12次 浏览次数:22次