| 4th ModTech International Conference - Modern Technologies in Industrial Engineering | |
| Modelling of series of types of automated trenchless works tunneling | |
| Gendarz, P.^1 ; Rzasinski, R.^2 | |
| Institute of Engineering Processes Automation and Integrated Manufacturing Systems, Poland^1 | |
| Silesian University of Technology, Konarskiego Street 18a, Gliwice | |
| 44-100, Poland^2 | |
| 关键词: Algorithmic methods; CNC machine; Computer aided methods; Design solutions; Manufacturing process; Micro-tunneling; Technological process; Underground installations; | |
| Others : https://iopscience.iop.org/article/10.1088/1757-899X/145/4/042031/pdf DOI : 10.1088/1757-899X/145/4/042031 |
|
| 来源: IOP | |
PDF
|
|
【 摘 要 】
Microtunneling is the newest method for making underground installations. Show method is the result of experience and methods applied in other, previous methods of trenchless underground works. It is considered reasonable to elaborate a series of types of construction of tunneling machines, to develop this particular earthworks method. There are many design solutions of machines, but the current goal is to develop non - excavation robotized machine. Erosion machines with main dimensions of the tunnels which are: 1600, 2000, 2500, 3150 are design with use of the computer aided methods. Series of types of construction of tunneling machines creating process was preceded by analysis of current state. The verification of practical methodology of creating the systematic part series was based on the designed erosion machines series of types. There were developed: method of construction similarity of the erosion machines, algorithmic methods of quantitative construction attributes variant analyzes in the I-DEAS advanced graphical program, relational and program parameterization. There manufacturing process of the parts will be created, which allows to verify the technological process on the CNC machines. The models of designed will be modified and the construction will be consulted with erosion machine users and manufacturers like: Tauber Rohrbau GmbH & Co.KG from Minster, OHL ZS a.s. from Brna,. The companies' acceptance will result in practical verification by JUMARPOL company.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| Modelling of series of types of automated trenchless works tunneling | 1442KB |
PDF