会议论文详细信息
8th International Particle Accelerator Conference
Construction and commissioning of direct beam transport line for PF-AR
Higashi, Nao^1 ; Asaoka, Seiji^1 ; Furukawa, Kazuro^1 ; Haga, Kaiichi^1 ; Harada, Kentaro^1 ; Higo, Toshiyasu^1 ; Honda, Tohru^1 ; Honma, Hiroyuki^1 ; Iida, Naoko^1 ; Iwase, Hiroshi^1 ; Kakihara, Kazuhisa^1 ; Kamitani, Takuya^1 ; Kikuchi, Mitsuo^1 ; Kishimoto, Yuji^1 ; Kobayashi, Yukinori^1 ; Kodama, Kota^1 ; Kudo, Kikuo^1 ; Kume, Tatsuya^1 ; Mikawa, Katsuhiko^1 ; Mimashi, Toshihiro^1 ; Miyahara, Fusashi^1 ; Miyauchi, Hiroshi^1 ; Nagahashi, Shinya^1 ; Nakamura, Hajime^1 ; Nakamura, Norio^1 ; Natsui, Takuya^1 ; Nigorikawa, Kazuyuki^1 ; Niwa, Yasuhiro^1 ; Nogami, Takashi^1 ; Obina, Takashi^1 ; Ogawa, Yujiro^1 ; Ono, Masaaki^1 ; Ozaki, Toshiyuki^1 ; Sagehashi, Hidenori^1 ; Sanami, Toshiya^1 ; Sato, Masayuki^1 ; Satoh, Masanori^1 ; Suwada, Tsuyoshi^1 ; Tadano, Mikito^1 ; Tahara, Toshihiro^1 ; Takai, Ryota^1 ; Takaki, Hiroyuki^1 ; Takasaki, Seiji^1 ; Tanaka, Madoka^1 ; Tanimoto, Yasunori^1 ; Tawada, Masafumi^1 ; Toge, Nobu^1 ; Uchiyama, Takashi^1 ; Ueda, Akira^1 ; Yamada, Yusuke^1 ; Yamamoto, Masahiro^1 ; Yoshida, Mitsuhiro^1
High Energy Accelerator Research Organization, KEK, 1-1, Oho, Ibaraki, Tsukuba, Japan^1
关键词: 10 minutes;    Beam transport line;    Direct beams;    Injection energy;    Injection mode;    Mode switches;    SuperKEKB;    Synchrotron radiation source;   
Others  :  https://iopscience.iop.org/article/10.1088/1742-6596/874/1/012024/pdf
DOI  :  10.1088/1742-6596/874/1/012024
来源: IOP
PDF
【 摘 要 】
PF-AR was constructed as an accumulator ring for TRISTAN, and in the KEKB era it has been revitalized as a 6.5 GeV synchrotron radiation source. The injection energy was 3 GeV and the beam was accelerated to 6.5 GeV prior to the user run. The original beam transport line (BT) from the LINAC to the PF-AR shared its upstream part with the the BT line of KEKB High Energy Ring (HER). The injection-mode change from PF-AR to HER or vice versa needs about 10 minutes for the magnet cycling procedure of the shared part. In SuperKEKB, the upgrade of KEKB, the lifetime of HER is about 10 minutes. The mode-switch operation of the BT is, therefore, not allowed for maintaining the highest luminosity of the SuperKEKB. In order to avoid this problem, a new 6.5 GeV BT line dedicated to PF-AR has been constructed. This also enables the top-up injection for the user run. The commissioning of the new BT line has been completed in this March, and now the first user run has been operated successfully.