会议论文详细信息
| 8th International Particle Accelerator Conference | |
| Installation management for the European XFEL main accelerator | |
| Bousonville, M.^1 ; Eints, F.^1 ; Choroba, S.^1 | |
| DESY Deutsches Elektronen-Synchrotron, Hamburg, Germany^1 | |
| 关键词: Complex machines; European xfel; Installation management; Management method; | |
| Others : https://iopscience.iop.org/article/10.1088/1742-6596/874/1/012016/pdf DOI : 10.1088/1742-6596/874/1/012016 |
|
| 来源: IOP | |
PDF
|
|
【 摘 要 】
By end of 2016, the main accelerator of the European XFEL was completed. To build this complex machine in a minimum of time, certain management methods were introduced in mid 2015, which accelerated the installation process substantially. In the following 64 weeks additional 84 % of the main accelerator were set up. This was possible due to an improved planning, the reinforcement of two teams as well as a permanent controlling and optimizing of the installation process. In this paper, the installation process from July 2015 to end 2016 and the measures, which speeded up the workflow, are described.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| Installation management for the European XFEL main accelerator | 997KB |
PDF