| 10th Asia Plasma and Fusion Association Conference | |
| Indian Test Facility (INTF) and its updates | |
| Bandyopadhyay, M.^1 ; Chakraborty, A.^1 ; Rotti, C.^1 ; Joshi, J.^1 ; Patel, H.^1 ; Yadav, A.^1 ; Shah, S.^1 ; Tyagi, H.^1 ; Parmar, D.^1 ; Sudhir, Dass^1 ; Gahlaut, A.^2 ; Bansal, G.^2 ; Soni, J.^2 ; Pandya, K.^2 ; Pandey, R.^2 ; Yadav, R.^1 ; Nagaraju, M.V.^1 ; Mahesh, V.^2 ; Pillai, S.^1 ; Sharma, D.^2 ; Singh, D.^1 ; Bhuyan, M.^1 ; Mistry, H.^2 ; Parmar, K.^2 ; Patel, M.^1 ; Patel, K.^2 ; Prajapati, B.^2 ; Shishangiya, H.^1 ; Vishnudev, M.^1 ; Bhagora, J.^1 | |
| ITER-India, Institute for Plasma Research, Bhat, Gandhinagar | |
| 382 428, India^1 | |
| Institute for Plasma Research, Bhat, Gandhinagar | |
| 382 428, India^2 | |
| 关键词: Commissioning phase; Diagnostic systems; Ion production; ITER diagnostics; Neutral beam injectors (NBI); Nuclear facilities; Safe operation; System development; | |
| Others : https://iopscience.iop.org/article/10.1088/1742-6596/823/1/012001/pdf DOI : 10.1088/1742-6596/823/1/012001 |
|
| 来源: IOP | |
PDF
|
|
【 摘 要 】
To characterize ITER Diagnostic Neutral Beam (DNB) system with full specification and to support IPR's negative ion beam based neutral beam injector (NBI) system development program, a R&D facility, named INTF is under commissioning phase. Implementation of a successful DNB at ITER requires several challenges need to be overcome. These issues are related to the negative ion production, its neutralization and corresponding neutral beam transport over the path lengths of ∼ 20.67 m to reach ITER plasma. DNB is a procurement package for INDIA, as an in-kind contribution to ITER. Since ITER is considered as a nuclear facility, minimum diagnostic systems, linked with safe operation of the machine are planned to be incorporated in it and so there is difficulty to characterize DNB after onsite commissioning. Therefore, the delivery of DNB to ITER will be benefited if DNB is operated and characterized prior to onsite commissioning. INTF has been envisaged to be operational with the large size ion source activities in the similar timeline, as with the SPIDER (RFX, Padova) facility. This paper describes some of the development updates of the facility.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| Indian Test Facility (INTF) and its updates | 197KB |
PDF