会议论文详细信息
14th Mexican Workshop on Particles and Fields
Quality Certification 4 (QC4) for RE4 in the Upgrade in CMS
Bernardino, S. Carpinteyro^1
Facultad de Ciencias Física Matemáticas, Benemérita Universidad Autónoma de Puebla, Mexico^1
关键词: Cathode strip chambers;    CMS detectors;    End-cap regions;    Level-1 triggers;    Muon trigger detectors;    Quality certification;    Resistive plate chambers;    Time resolution;   
Others  :  https://iopscience.iop.org/article/10.1088/1742-6596/651/1/012005/pdf
DOI  :  10.1088/1742-6596/651/1/012005
来源: IOP
PDF
【 摘 要 】

The CMS muon system consist of Drif Tubes (DTs) in barrel region, Cathode Strip Chambers (CSCs) in the end-cap region and Resistive Plate Chambers (RPCs) in both regions. The RPCs with their excellent time resolution were chosen as dedicated muon trigger detector for the CMS experiment. After the Long Shutdown 1 (LS1) the LHC luminosity should reach 1034cm-2s-1thus it is necessary to improve the level 1 trigger efficiency of the CMS detector for this high luminosity, to achieve that a 4th RPCs layer (RE4) in both end-caps of the CMS detector and all the components must be installed and completely validated. Based on the valuable experience (Barrel & Endcap) are defined several steps of Quality Certification (QC): QC1 (Components), QC2 (Gaps), QC3 (Chambers), QC4 (chambers & Super Modules), QC5 (Commissioning at P5). In this work is presented some results of QC4.

【 预 览 】
附件列表
Files Size Format View
Quality Certification 4 (QC4) for RE4 in the Upgrade in CMS 1367KB PDF download
  文献评价指标  
  下载次数:10次 浏览次数:26次