会议论文详细信息
| 16th International Conference on Positron Annihilation | |
| New experiment stations at KEK Slow Positron Facility | |
| Wada, K.^1 ; Hyodo, T.^1 ; Kosuge, T.^1 ; Saito, Y.^1 ; Ikeda, M.^2 ; Ohsawa, S.^2 ; Shidara, T.^2 ; Michishio, K.^3 ; Tachibana, T.^3 ; Terabe, H.^3 ; Suzuki, R.H.^3 ; Nagashima, Y.^3 ; Fukaya, Y.^4 ; Maekawa, M.^4 ; Mochizuki, I.^4 ; Kawasuso, A.^4 | |
| Institute of Materials Structure Science, High Energy Accelerator Research Organization (KEK), 1-1 Oho, Tsukuba, Ibaraki 305-0801, Japan^1 | |
| Accelerator Laboratory, High Energy Accelerator Research Organization (KEK), 1-1 Oho, Tsukuba, Ibaraki 305-0801, Japan^2 | |
| Department of Physics, Tokyo University of Science, 1-3 Kagurazaka, Shinjuku, Tokyo 162-8601, Japan^3 | |
| Advanced Science Research Center, Japan Atomic Energy Agency, 1233 Watanuki, Takasaki, Gunma 370-1292, Japan^4 | |
| 关键词: Branching units; High intensity; High-energy accelerator; Institute of materials; Production units; Research organization; Slow positron; Slow positron beam; | |
| Others : https://iopscience.iop.org/article/10.1088/1742-6596/443/1/012082/pdf DOI : 10.1088/1742-6596/443/1/012082 |
|
| 来源: IOP | |
PDF
|
|
【 摘 要 】
Recent development of the Slow Positron Facility at the Institute of Materials Structure Science, High Energy Accelerator Research Organization (KEK) is reported. The facility, equipped with a dedicated 55 MeV linac, provides a high-intensity, pulsed slow-positron beam. The beam is produced in a production unit at a high tension of up to 35 kV and guided magnetically through a grounded beam line, and then branched using compact branching units in the experiment hall. An overview, some details of three experiments currently conducted and the outlook of the facility are described.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| New experiment stations at KEK Slow Positron Facility | 742KB |
PDF