会议论文详细信息
16th International Conference on Positron Annihilation
The Upgrade of the Neutron Induced Positron Source NEPOMUC
Hugenschmidt, C.^1,2 ; Ceeh, H.^1 ; Gigl, T.^1,2 ; Lippert, F.^1 ; Piochacz, C.^1,2 ; Pikart, P.^1 ; Reiner, M.^1 ; Weber, J.^1 ; Zimnik, S.^1
Physik-Department E21, Technische Universität München, James-Franck-Straße 1, 85748 Garching, Germany^1
FRM II, Technische Universität München, Lichtenbergstraße 1, 85748 Garching, Germany^2
关键词: Beam tubes;    Measured temperatures;    NEPOMUC;    Operation time;    Pair production;    Positron beams;    Positron sources;    Reliable operation;   
Others  :  https://iopscience.iop.org/article/10.1088/1742-6596/443/1/012079/pdf
DOI  :  10.1088/1742-6596/443/1/012079
来源: IOP
PDF
【 摘 要 】

In summer 2012, the new NEutron induced POsitron Source MUniCh (NEPOMUC) was installed and put into operation at the research reactor FRM II. At NEPOMUC upgrade 80%113Cd enriched Cd is used as neutron-gamma converter in order to ensure an operation time of 25 years. A structure of Pt foils inside the beam tube generates positrons by pair production. Moderated positrons leaving the Pt front foil are electrically extracted and magnetically guided to the outside of the reactor pool. The whole design, including Pt-foils, the electric lenses and the magnetic fields, has been improved in order to enhance both the intensity and the brightness of the positron beam. After adjusting the potentials and the magnetic guide and compensation fields an intensity of about 3·109moderated positrons per second is expected. During the first start-up, the measured temperatures of about 90°C ensure a reliable operation of the positron source. Within this contribution the features and the status of NEPOMUC upgrade are elucidated. In addition, an overview of recent positron beam experiments and current developments at the spectrometers is given.

【 预 览 】
附件列表
Files Size Format View
The Upgrade of the Neutron Induced Positron Source NEPOMUC 3269KB PDF download
  文献评价指标  
  下载次数:12次 浏览次数:21次